Project: Hilton Garden Inn - Atlanta, GA
Colors: White Rose
Quantities: 488.2m2 / 5255.12SF
Containers: 1*20GP & 1*40GP
Process time: 21st May, 2012
Shipment time: 19th July, 2012
The granite color of Brazilian White Rose used for the Hilton Garden Inn project
is in harmony with the beautiful wall and milkwork of the bathroom. It gives
anyone who lives in the room a warm and fuzzy feeling. When you happen to
travel in Atlanta, you may go for a look.
The processing was finished on 13th of July and installed by the end of August.
All the vanity tops feature stylish bowed front, it is with a laminated 1" overhang
from vanity base at front. The tops match with the milkworks/cabinets quite
well.
Project: Home Wood Suites - Atlanta, GA
Colors: Brazil Rose
Quantities: 488.2m2 / 5255.12SF
Containers: 1*20GP & 1*40GP
Process time: 21st May, 2012
Shipment time: 19th July, 2012
This is another Brazilian White Rose Granite tops project finished on 13th July. The whole project includes 85 sets of 77 1/4" kitchen granite tops, 7 sets of 101 1/4" kitchen granite tops, 87 sets of 52"x24" bathroom vanity tops and 7 sets of 51"x28" bathroom vanity tops. Same as the Hilton Garden Inn project, these granite tops also featured a stylish bowed front, with a laminated 1" overhang from vanity base at front. The tops match the milkworks/cabinets quite well.
Project: Vanity top - Atlanta, GA
Colors: Bainbrook Brown, China Impala Black & Golden Sand
Thichness: 3/4"
Quantities: 3543.60SF
Containers: 1*20GP
Process time: 2nd July, 2012
Shipment time: 30th July, 2012
This hotel renovation project was finished on 27th July, 2012. The order includes vanity tops with splashes, apron and white undermount 17"x14" ceramic sink. The vanity tops were finished with 1 or 2 u/m oval sink cutout, 4" faucet hole, 4 gromet hole and 1 long edge eased and polished. All granite tops are packaged by strong exporting wooden crates, while all the sinks are packaged by 3pcs per carton with pallet. Mix-loading the container with granite tops and sinks saves lots of cost for the clients.
Project: Hotel Renovation Project - Savannah, GA 31419
Colors: Santa Cecilia Light and Blue Pearl
Quantities: 2242.20SF
Rectangular sink: 72pcs white BMU-1813 sinks
Containers: 1*20GP
Process time: 21st July, 2012
Shipment time: 9th August, 2012
This project finished on 4th August, 2012. Products include vanity top, tub
surround, window sills, threshold, front desk top and rectangular sink. All granite
tops are high polished, with edges of bullnose, half bullnose and eased polished.
The undermount sink used is the popular 18"x13" rectangular sink in USA, all
sinks are laser marked with client's logo. Our one stop service to offer various
matching products and expert co-loading service to save both shipping cost and
time for the customers.
Here to show you more detailed pictures of this project.
Project: 349 units-Greenville, SC
Colors: 3cm Ubatuba & Sesame Gold
Quantities: 13235.74SF
Containers: 6*20GP
Process time: 2nd, August, 2012
Shipment time: 13th, September, 2012
In 2012, customers got more opportunities to work on apartments and student housing appartments projects. It is said that this kind of projects will increase next year. With our outstanding processing, the kitchen countertops we produce are of high quality and supports clients work well.
This kitchen countertop project was finished on 10th, Sep, 2012 with the color of Ubatuba and Sesame Gold. All tops including the splashes were finished in 3cm slabs. Eased polished for all exposed edges. The whole job includes 182 sets of Ubatuba kitchen tops and 167 sets of Sesame Gold kitchen tops.
Please find some pictures for this job below. You will find perfect quality control here.
Project: Stockman Hotel - Elko, NV 89801
Colors: 2cm Maple Red
Quantities: 3320.78SF
Containers: 1*20GP
Process time: 5 May, 2012
Shipment time: 1 June, 2012
This Marple Red project was finished on 28 May, 2012. Tops and splashes in 2cm thickness, with surface polished, and edge finished OG and EE polished. The whole project included 166 sets of countertops, 54 sets of vanities, 59 sets of chests and 108 sets of table tops. The OG edge were processed on our CNC machining and polished by skilled workers, to increased production and faster fabrication, with consistent high quality. Some photos of this project are shown below , Please feel free to browse them.
- « first
- ‹ previous
- 1
- 2
- 3